Órdenes de Compra — Consultorías
87 OC(s) · Comprometido $553.774.594 · Facturado $219.476.271 · Por facturar $334.298.323
🏗 VALLES DE MAULE IV 312 VIV (DS49) (7010100045) 4 OC · $24.915.322
▸ BIO INGENIERIA LIMITADA (77.688.309-3) 4 OC · $24.915.322
• AGUA POTABLE / ALCANTARILLADO 2 OC · $11.844.989
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 81876 | 2026-08-03 | DISEÑO RED PÚBLICA DE ALCANTARILLADO | $5.922.495 | $0 | $5.922.495 | Pendiente | |
| 81876 | 2026-08-03 | PROYECTO REDES AGUA POTABLE | $5.922.495 | $0 | $5.922.495 | Pendiente | Precio anómalo vs histórico |
🏗 LOTEO LOS NICHES 393 VIV DS-49 (Parcela 25 Casas Grandes) (7010100048) 1 OC · $1.590.193
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $1.590.193
• IMIV 1 OC · $1.590.193
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 76738 | 2026-01-12 | SERVICIO ESTUDIO VIAL AMBIENTAL | $1.590.193 | $1.620.313 | $1.113.135 | Facturado | Más de un pago el mismo díaHitos incompletos (1-2 facturas) |
🏗 VIÑA BRASIL, CEMENTERIO, MOLINA 347 VIV DS 49 (7010100065) 2 OC · $20.268.788
▸ GERARDO CID INGENIERO CIVIL SPA (77.251.819-6) 2 OC · $20.268.788
• MODIFICACIÓN DE CAUCE 1 OC · $8.482.712
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80238 | 2026-06-16 | PROYECTO DE MODIFICACION DE CAUCE | $8.482.712 | $5.946.492 | $5.937.899 | Parcial | Mismo servicio, 2+ proveedores |
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $11.786.076
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80238 | 2026-06-16 | PROYECTO AGUAS LLUVIAS | $11.786.076 | $8.262.193 | $8.250.253 | Parcial | Precio anómalo vs histórico |
🏗 BRISAS DE LA VIÑA (MIRADOR CAIVAN III) (7010100067) 4 OC · $8.529.812
▸ RADAL INGENIEROS CONSULTORES SP (77.091.702-6) 2 OC · $4.494.086
• AGUA POTABLE / ALCANTARILLADO 1 OC · $2.042.766
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 82429 | 2026-08-17 | DISEÑO REFUERZOS DE AP Y AS | $2.042.766 | $0 | $2.042.766 | Pendiente |
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $2.451.320
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 82429 | 2026-08-17 | PROYECTO ROTURA Y REPOSICION DE PAVIMENTO | $2.451.320 | $0 | $2.451.320 | Pendiente |
▸ GERARDO CID INGENIERO CIVIL SPA (77.251.819-6) 1 OC · $2.445.540
• MODIFICACIÓN DE CAUCE 1 OC · $2.445.540
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78671 | 2026-04-13 | PROYECTO DE MODIFICACION DE CAUCE | $2.445.540 | $2.470.835 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $1.590.187
• IMIV 1 OC · $1.590.187
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77107 | 2026-01-28 | SERVICIO ESTUDIO VIAL AMBIENTAL | $1.590.187 | $967.684 | $1.113.131 | Parcial |
🏗 VIÑA ALAMEDA DE VILLA ALEGRE, 950 VIV. (DS19-DS49) (7010100070) 1 OC · $4.766.713
▸ JRG INGIENIERIA SPA (76.912.667-8) 1 OC · $4.766.713
• IMIV 1 OC · $4.766.713
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77454 | 2026-02-16 | PROYECTO ACCESO VIAL | $4.766.713 | $0 | $4.766.713 | Pendiente |
🏗 ALTOS DE PANGAL, 200 DEPTOS DS49 (7010100071) 2 OC · $13.837.102
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $1.590.193
• IMIV 1 OC · $1.590.193
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 76742 | 2026-01-12 | SERVICIO ESTUDIO VIAL AMBIENTAL | $1.590.193 | $1.620.313 | $1.113.135 | Facturado | Más de un pago el mismo día |
▸ AUTOMATICA Y REGULACION S.A. (87.606.700-5) 1 OC · $12.246.909
• TRÁNSITO 1 OC · $12.246.909
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80613 | 2026-07-01 | PROYECTO SEMAFORIZACION | $12.246.909 | $980.275 | $11.267.156 | Parcial |
🏗 LOTE A, FUNDO LIRCAY ROL 9000-12 (ALTOS DE LIRCAY) (7010100072) 5 OC · $88.573.460
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $13.505.687
• IMIV 1 OC · $13.505.687
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77456 | 2026-02-16 | IMIV MAYOR | $13.505.687 | $0 | $13.505.687 | Pendiente |
▸ DSS S.A (77.904.240-5) 3 OC · $68.527.758
• DIA 1 OC · $51.794.236
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77923 | 2026-03-10 | DECLARACION IMPACTO AMBIENTAL | $51.794.236 | $18.323.581 | $41.435.389 | Parcial |
▸ VICTOR HUGO ZAMBRANO GONZALEZ (9.764.126-9) 1 OC · $6.540.014
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $6.540.014
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 83045 | 2026-09-01 | PROYECTO DE PAVIMENTACION | $6.540.014 | $2.289.079 | $4.251.009 | Parcial |
🏗 VALLES DE MOLINA VI Y VII (LOTE 3 Y LOTE 4) (7010100074) 1 OC · $9.562.013
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $9.562.013
• IMIV 1 OC · $9.562.013
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78276 | 2026-03-26 | IMIV | $9.562.013 | $5.737.208 | $3.824.805 | Parcial | Más de un pago el mismo día |
🏗 LOTEO PLAZA NORTE, TENO (LOTE N°1 Y 2, LOTE 5 Y 10) (7010100077) 4 OC · $36.064.237
▸ SONDAJES SONDAP LIMITADA (76.939.971-2) 1 OC · $8.769.356
• ÁREAS VERDES 1 OC · $8.769.356
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80342 | 2026-06-18 | ESTUDIO MECANICA DE SUELOS | $8.769.356 | $8.779.643 | $7.015.484 | Facturado | Mismo servicio, 2+ proveedoresHitos incompletos (1-2 facturas) |
▸ NONGUEN INGENERIA ELECTRICA SPA (77.176.514-9) 1 OC · $4.492.029
• ÁREAS VERDES 1 OC · $4.492.029
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80727 | 2026-07-06 | DISEÑO PROYECTO ELECTRICO | $4.492.029 | $4.494.086 | $4.492.029 | Facturado | Hitos incompletos (1-2 facturas) |
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $9.562.013
• IMIV 1 OC · $9.562.013
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78277 | 2026-03-26 | IMIV | $9.562.013 | $9.675.234 | $3.824.805 | Facturado |
▸ RUZ VUKASOVIC ING. DE SUELOS LTDA (78.927.300-6) 1 OC · $13.240.839
• ÁREAS VERDES 1 OC · $13.240.839
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77574 | 2026-02-23 | ESTUDIO MECANICA DE SUELOS | $13.240.839 | $0 | $13.240.839 | Pendiente | OC duplicada (mismo servicio/obra)Mismo servicio, 2+ proveedores |
🏗 LOTEO ALTOS DE QUECHEREGUAS, ROL 606-5 MOLINA (7010100084) 1 OC · $9.648.442
▸ ALEJANDRO PIZARRO Y CIA SPA (78.842.890-1) 1 OC · $9.648.442
• IMIV 1 OC · $9.648.442
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 84058 | 2026-09-30 | IMIV | $9.648.442 | $0 | $9.648.442 | Pendiente |
🏗 VIÑA ALAMEDA - 296 VIV. (DS19) LOTE A+B PRE ROL 202-120 Y 202-121 (7010100086) 4 OC · $24.666.703
▸ SOCIEDAD DE PROFESIONALES CONSULTORA F&F LIMITADA (78.157.629-8) 4 OC · $24.666.703
• AGUA POTABLE / ALCANTARILLADO 2 OC · $9.785.138
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80153 | 2026-06-12 | DISEÑO RED DOMICILIARIA DE ALCANTARILLADO SSM | $4.892.569 | $4.908.713 | $3.424.798 | Facturado | |
| 80153 | 2026-06-12 | PROYECTO REDES AGUA POTABLE | $4.892.569 | $4.908.713 | $3.424.798 | Facturado |
• MODIFICACIÓN DE CAUCE 1 OC · $9.785.138
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80153 | 2026-06-12 | PROYECTO DE MODIFICACION DE CAUCE | $9.785.138 | $2.938.280 | $6.849.597 | Parcial |
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $5.096.426
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80153 | 2026-06-12 | PROYECTO AGUAS LLUVIAS | $5.096.426 | $3.062.429 | $3.567.498 | Parcial |
🏗 LOMAS DE LA VIÑA I - 246 VIV. (DS49) LOTE D PRE ROL 202-123 (7010100087) 6 OC · $23.689.978
▸ SOCIEDAD DE PROFESIONALES CONSULTORA F&F LIMITADA (78.157.629-8) 6 OC · $23.689.978
• AGUA POTABLE / ALCANTARILLADO 4 OC · $11.028.093
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80925 | 2026-07-09 | DISEÑO RED PÚBLICA DE ALCANTARILLADO | $3.267.583 | $980.654 | $3.267.583 | Parcial | |
| 80925 | 2026-07-09 | PROYECTO REDES AGUA POTABLE | $2.450.687 | $735.491 | $2.450.687 | Parcial | |
| 80925 | 2026-07-09 | PROYECTO MEJORAMIENTO AGUA POTABLE | $3.267.583 | $0 | $3.267.583 | Pendiente | |
| 80925 | 2026-07-09 | PROYECTO MEJORAMIENTO ALCANTARILLADO | $2.042.240 | $0 | $2.042.240 | Pendiente |
🏗 LOMAS DE LA VIÑA II - 81 VIV. (DS49) LOTE C PRE ROL 202-122 (7010100088) 3 OC · $5.718.271
▸ SOCIEDAD DE PROFESIONALES CONSULTORA F&F LIMITADA (78.157.629-8) 3 OC · $5.718.271
• AGUA POTABLE / ALCANTARILLADO 2 OC · $3.267.583
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80926 | 2026-07-09 | DISEÑO RED PÚBLICA DE ALCANTARILLADO | $1.838.016 | $0 | $1.838.016 | Pendiente | |
| 80926 | 2026-07-09 | PROYECTO REDES AGUA POTABLE | $1.429.568 | $0 | $1.429.568 | Pendiente |
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $2.450.687
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80926 | 2026-07-09 | PROYECTO DE PAVIMENTACION Y AGUAS LLUVIAS | $2.450.687 | $0 | $2.450.687 | Pendiente |
🏗 LOMAS DE LA VIÑA III - 275 VIV. (DS49) LOTE E PRE ROL 202-124 (7010100089) 3 OC · $13.887.229
▸ SOCIEDAD DE PROFESIONALES CONSULTORA F&F LIMITADA (78.157.629-8) 3 OC · $13.887.229
• AGUA POTABLE / ALCANTARILLADO 2 OC · $6.943.614
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80927 | 2026-07-09 | DISEÑO RED PÚBLICA DE ALCANTARILLADO | $4.084.479 | $0 | $4.084.479 | Pendiente | |
| 80927 | 2026-07-09 | PROYECTO REDES AGUA POTABLE | $2.859.135 | $0 | $2.859.135 | Pendiente |
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $6.943.614
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80927 | 2026-07-09 | PROYECTO DE PAVIMENTACION Y AGUAS LLUVIAS | $6.943.614 | $0 | $6.943.614 | Pendiente |
🏗 PARQUE LA RESERVA (PARCELA 4 - D) (7010100091) 7 OC · $85.620.762
▸ JRG INGIENIERIA SPA (76.912.667-8) 1 OC · $9.589.579
• IMIV 1 OC · $9.589.579
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80467 | 2026-06-25 | PROYECTO ACCESO VIAL | $9.589.579 | $3.650.145 | $9.589.579 | Parcial |
▸ GERARDO CID INGENIERO CIVIL SPA (77.251.819-6) 5 OC · $19.256.925
• AGUA POTABLE / ALCANTARILLADO 3 OC · $9.179.678
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80385 | 2026-06-22 | PROYECTO DOMICILIARIA AP Y AS | $2.447.914 | $735.206 | $2.447.914 | Parcial | |
| 80385 | 2026-06-22 | DISEÑO RED PUBLICA AGUA POTABLE | $3.263.886 | $1.041.542 | $3.263.886 | Parcial | |
| 80385 | 2026-06-22 | DISEÑO RED PÚBLICA DE ALCANTARILLADO | $3.467.878 | $1.041.542 | $3.467.878 | Parcial |
▸ ALEJANDRO PIZARRO Y CIA SPA (78.842.890-1) 1 OC · $56.774.258
• DIA 1 OC · $56.774.258
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 81308 | 2026-07-17 | DECLARACION IMPACTO AMBIENTAL | $56.774.258 | $17.032.278 | $56.774.258 | Parcial |
🏗 VALLES LAS HERAS DE PARRAL, 143 VIV - DS 49 (Q570) 2 OC · $4.987.500
▸ SERVICIOS DE INGENIERIA Y CONSTRUCCION (76.840.251-5) 1 OC · $2.487.500
• AGUA POTABLE / ALCANTARILLADO 1 OC · $2.487.500
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80897 | 2026-07-09 | LINE STOP CONEXION MATRIZ AGUA POTABLE | $2.487.500 | $2.487.500 | $2.487.500 | Facturado | Hitos incompletos (1-2 facturas) |
▸ GERARDO CID INGENIERO CIVIL SPA (77.251.819-6) 1 OC · $2.500.000
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $2.500.000
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78591 | 2026-04-09 | PROYECTO DE MODIFICACION DE CAUCE | $2.500.000 | $2.500.000 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
🏗 MARGOT DUHALDE 1 Y 2; 490 VIVI DS 19 , SAN JAVIER (Q590) 5 OC · $21.908.165
▸ BIODIVERSA S.A (76.047.175-5) 1 OC · $657.388
• DIA 1 OC · $657.388
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78488 | 2026-04-02 | SERVICIO DE MONITOREO RUIDOS AMBIENTALES | $657.388 | $0 | $657.388 | Pendiente |
▸ QUALITY LAB. LAB CONSULTORIA Y CAPACITACION LTDA. (76.212.570-6) 1 OC · $47.328
• AGUA POTABLE / ALCANTARILLADO 1 OC · $47.328
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80305 | 2026-06-18 | ENSAYO LABORATORIO | $47.328 | $47.328 | $0 | Facturado | Más de un pago el mismo díaHitos incompletos (1-2 facturas) |
▸ APICA INGENIERIA SPA (76.912.716-K) 2 OC · $11.981.660
• AGUA POTABLE / ALCANTARILLADO 2 OC · $11.981.660
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78982 | 2026-04-24 | INSPECCION TECNICA OBRA SANITARIA | $7.813.752 | $8.014.582 | $6.251.001 | Facturado | Facturado ≠ monto totalMás de un pago el mismo díaSobre-fraccionado (4+ facturas) |
| 79095 | 2026-04-29 | INSPECCION TECNICA OBRA SANITARIA | $4.167.908 | $4.213.766 | $2.257.617 | Facturado | Más de un pago el mismo día |
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $9.221.789
• IMIV 1 OC · $9.221.789
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77052 | 2026-01-26 | IMIV MAYOR | $9.221.789 | $9.490.496 | $92.218 | Facturado | Facturado ≠ monto totalMás de un pago el mismo díaVarianza vs 30/30/40 |
🏗 MIRADOR CAIVAN I, 600 DEPTOS DS 49 (Q600) 1 OC · $1.102.004
▸ CONSTRUCTORA E INGENIERIA MAULE SPA (77.673.089-0) 1 OC · $1.102.004
• AGUA POTABLE / ALCANTARILLADO 1 OC · $1.102.004
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 76703 | 2026-01-12 | INSPECCION TECNICA OBRA SANITARIA | $1.102.004 | $1.101.719 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
🏗 DOÑA PAULA, 368 VIV DS49, ROMERAL (Q610) 1 OC · $2.528.167
▸ DSS S.A (77.904.240-5) 1 OC · $2.528.167
• IMIV 1 OC · $2.528.167
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 77371 | 2026-02-10 | ESTUDIO FLUJO DE TRANSPORTE | $2.528.167 | $3.281.421 | $0 | Facturado | Facturado ≠ monto totalVarianza vs 30/30/40 |
🏗 LOTEO ELOISA DIAZ 195 VIV, DS19, LINARES (Q640) 4 OC · $13.145.199
▸ BIODIVERSA S.A (76.047.175-5) 1 OC · $617.547
• DIA 1 OC · $617.547
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78487 | 2026-04-02 | SERVICIO DE MONITOREO RUIDOS AMBIENTALES | $617.547 | $628.941 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
▸ RADAL INGENIEROS CONSULTORES SP (77.091.702-6) 1 OC · $3.426.117
• IMIV 1 OC · $3.426.117
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 79445 | 2026-05-13 | IMIV | $3.426.117 | $1.039.030 | $2.398.282 | Parcial |
▸ CONSTRUCTORA E INGENIERIA MAULE SPA (77.673.089-0) 1 OC · $3.922.112
• AGUA POTABLE / ALCANTARILLADO 1 OC · $3.922.112
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 82417 | 2026-08-17 | INSPECCION TECNICA OBRA SANITARIA | $3.922.112 | $2.615.879 | $3.922.112 | Parcial | Precio anómalo vs histórico |
▸ ALEJANDRO PIZARRO Y CIA SPA (78.842.890-1) 1 OC · $5.179.424
• DIA 1 OC · $5.179.424
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78153 | 2026-03-20 | PERMISOS AMBIENTALES SECTORIALES | $5.179.424 | $5.179.424 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
🏗 CONDOMINIO MARINA COLBUN, 193 LOTES (Q650) 1 OC · $26.556.816
▸ CAIRO SPA (78.318.286-6) 1 OC · $26.556.816
• AGUA POTABLE / ALCANTARILLADO 1 OC · $26.556.816
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 82446 | 2026-08-18 | SERVICIOS DE ASESORIA | $26.556.816 | $5.320.145 | $23.901.134 | Parcial | Precio anómalo vs histórico |
🏗 MIRADOR CAIVAN II, 540 DEPTOS DS49 (Q660) 8 OC · $36.947.911
▸ BIODIVERSA S.A (76.047.175-5) 1 OC · $681.293
• DIA 1 OC · $681.293
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78486 | 2026-04-02 | SERVICIO DE MONITOREO RUIDOS AMBIENTALES | $681.293 | $693.864 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
▸ JRG INGIENIERIA SPA (76.912.667-8) 1 OC · $4.085.006
• IMIV 1 OC · $4.085.006
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 82326 | 2026-08-13 | IMIV | $4.085.006 | $0 | $4.085.006 | Pendiente |
▸ RADAL INGENIEROS CONSULTORES SP (77.091.702-6) 2 OC · $4.288.703
▸ CATCHPOLE Y ASOCIADOS LIMITADA (77.664.526-5) 1 OC · $1.597.373
• DIA 1 OC · $1.597.373
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78770 | 2026-04-16 | Estudio de Catastro Fauna Terrestre. | $1.597.373 | $1.625.105 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
▸ DSS S.A (77.904.240-5) 1 OC · $5.179.424
• DIA 1 OC · $5.179.424
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78375 | 2026-03-31 | DECLARACION IMPACTO AMBIENTAL | $5.179.424 | $2.940.470 | $3.832.773 | Parcial | Mismo servicio, 2+ proveedores |
▸ ALEJANDRO PIZARRO Y CIA SPA (78.842.890-1) 2 OC · $21.116.112
• DIA 2 OC · $21.116.112
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78152 | 2026-03-20 | DECLARACION IMPACTO AMBIENTAL | $14.542.228 | $14.542.228 | $0 | Facturado | Mismo servicio, 2+ proveedoresHitos incompletos (1-2 facturas) |
| 78152 | 2026-03-20 | PERMISOS AMBIENTALES SECTORIALES | $6.573.884 | $6.573.884 | $0 | Facturado | Hitos incompletos (1-2 facturas) |
🏗 CONDOMINIO GABRIELA MISTRAL 120 DEPTOS, DS 19 , LINARES (Q670) 1 OC · $1.593.669
▸ SOCIEDAD DE CONSULTORES DE TRANSPORTE Y URBANISMO (77.596.706-4) 1 OC · $1.593.669
• IMIV 1 OC · $1.593.669
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78278 | 2026-03-26 | SERVICIO ESTUDIO VIAL AMBIENTAL | $1.593.669 | $1.593.669 | $0 | Facturado | Más de un pago el mismo día |
🏗 LOMAS DEL PARQUE, 320 DEPTOS DS49 (Q690) 5 OC · $23.571.796
▸ BIODIVERSA S.A (76.047.175-5) 1 OC · $698.446
• DIA 1 OC · $698.446
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 81734 | 2026-07-30 | SERVICIO DE MONITOREO RUIDOS AMBIENTALES | $698.446 | $0 | $698.446 | Pendiente |
▸ CATCHPOLE Y ASOCIADOS LIMITADA (77.664.526-5) 1 OC · $5.392.904
• DIA 1 OC · $5.392.904
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 82426 | 2026-08-17 | ESTUDIO DE FAUNA ICTICA | $5.392.904 | $1.785.957 | $5.392.904 | Parcial |
▸ CONSTRUCTORA E INGENIERIA MAULE SPA (77.673.089-0) 2 OC · $13.077.937
▸ DSS S.A (77.904.240-5) 1 OC · $4.402.510
• DIA 1 OC · $4.402.510
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 78376 | 2026-03-31 | DECLARACION IMPACTO AMBIENTAL | $4.402.510 | $2.939.651 | $2.817.606 | Parcial |
🏗 LOTEO VALLES DE MOLINA VI 131 VIV DS49 (Q700) 2 OC · $16.035.958
▸ RADAL INGENIEROS CONSULTORES SP (77.091.702-6) 1 OC · $6.238.431
• PAVIMENTO/AGUAS LLUVIAS 1 OC · $6.238.431
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 79702 | 2026-05-25 | PROYECTO DE PAVIMENTACION | $6.238.431 | $1.882.478 | $6.238.431 | Parcial |
▸ CONSTRUCTORA E INGENIERIA MAULE SPA (77.673.089-0) 1 OC · $9.797.527
• AGUA POTABLE / ALCANTARILLADO 1 OC · $9.797.527
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80571 | 2026-07-01 | INSPECCION TECNICA OBRA SANITARIA | $9.797.527 | $1.642.988 | $9.797.527 | Parcial | Precio anómalo vs histórico |
🏗 GASTOS GENERALES DIRECTOS (Q710) 1 OC · $1.604.276
▸ RADAL INGENIEROS CONSULTORES SP (77.091.702-6) 1 OC · $1.604.276
• AGUA POTABLE / ALCANTARILLADO 1 OC · $1.604.276
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 79113 | 2026-04-29 | DISEÑO PROYECTO PEAS | $1.604.276 | $804.536 | $802.138 | Parcial |
🏗 CNA BODEGA CENTRAL (R020100001) 7 OC · $22.242.912
▸ BIO INGENIERIA LIMITADA (77.688.309-3) 1 OC · $2.042.240
• DIA 1 OC · $2.042.240
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 81459 | 2026-07-23 | PERTINENCIA DIA | $2.042.240 | $1.021.153 | $2.042.240 | Parcial |
▸ SOCIEDAD DE PROFESIONALES CONSULTORA F&F LIMITADA (78.157.629-8) 6 OC · $20.200.673
• AGUA POTABLE / ALCANTARILLADO 4 OC · $13.263.068
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 80510 | 2026-06-26 | DISEÑO PROYECTO COLECTORES AGUAS SERVIDAS | $3.264.755 | $0 | $3.264.755 | Pendiente | |
| 80510 | 2026-06-26 | PROYECTO REDES AGUA POTABLE | $2.040.472 | $0 | $2.040.472 | Pendiente | |
| 80510 | 2026-06-26 | PLANTA DE TRATAMIENTO DE AGUAS SERVIDAS (PTAS) | $6.529.510 | $0 | $6.529.510 | Pendiente | |
| 80510 | 2026-06-26 | DISEÑO RED DOMICILIARIA AGUA POTABLE | $1.428.330 | $0 | $1.428.330 | Pendiente |
🏗 VIVIENDA LOTE E-2 RESERVA LAS RASTRAS ICAMPOS (T640100001) 1 OC · $10.211.198
▸ ALEJANDRO PIZARRO Y CIA SPA (78.842.890-1) 1 OC · $10.211.198
• IMIV 1 OC · $10.211.198
| OC | Fecha | Recurso | Monto Total | Facturado | Pendiente | Estado | Alertas |
|---|---|---|---|---|---|---|---|
| 81372 | 2026-07-21 | IMIV | $10.211.198 | $2.859.135 | $10.211.198 | Parcial |